The manufacturer must provide a declaration that the pressure vessel is manufactured in accordance with relevant
guidelines for pressure equipment.
Following accompanying documents should be supplied with the treatment system and shall be available at the Site:
1.Operation instructions (including process description).
2.Loading and maintenance procedures.
3.Short-form of operation and loading procedures.
4.P&I diagram,...
Operational Capabilities
PROCESS MINIMUM 1 TON PER DAY
OPERATED WITH LIMITED TRAINING
REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING
COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS
ABILITY TO BURN WASTE LUBRICANTS (POL)
HANDLE ORGANIC SOLIDS (TO INCLUDE RMW)
DEPLOYABLE
MOBILE
24 HRS OF CONTINUOUS USE
AUTOMATIC LOADING SYSTEM
AUTOMATED ASH REMOVAL SYSTEM
GAS SCRUBBING SYSTEM
95% REDUCTION OF SOLID WASTE
OPERATE OFF DIESEL OR...
Capacité destructive de 55 Kg/h jour de déchets hospitaliers avec un p?.c. i jusqu’à 3.200 Kcal/Kg
1)Type de déchet
hospitalier
2)Pouvoir calorifique...
It must be a 3 chambered burner
The loads ability of 250 kg
The realty for the incinerator requirement to be able to stand up to the temperatures and additionally different other useful demands.
The smokeshaft should certainly have a solid refractory cellular lining of special type of concrete to stand up to temperature degrees above 1200oc.
It must have a solid base for the device to keep it secure, firm along with safe and secure as well as...
5-1- Chambre de post combustion est installée au dessus du foyer de combustion , elle est constituée d’un
cylindre métallique revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires.
5-2- Volume intérieur?: 2,1 m3
Est dimensionnée pour pouvoir garantir un temps de fumée de 2 secondes à 1100°C avec un pourcentage d’oxygène libre
d’au moins 6 %.
5-3...
Incinerators used will be limited to daylight hours of operation. This includes shutdown, cleaning and maintenance.
Waste streams shall not be mixed during the incineration process and the ash collection chamber will be cleaned when a
different waste stream is to be incinerated. The Company will provide the contractor with a list of items that can be
incinerated.
All ash will be collected and stored in individual storage bins for...
Equipped with main combustion chamber and a second chamber for reburning designed to ensure complete
combustion of the gases resulting from incomplete combustion of inert gases in the chimney, within the standards
recommended by the World Health Organization;
Equipped with temperature controller to adjust the air of the combustion of the waste, and fuel flow in the burners...
The following requirements are to be considered as an integral part of the technical specifications for each equipment
type.
The system offered shall be designed to operate normally under the conditions of different regions in Kenya. These
conditions may include but not limited to power supply, temperature, humidity, and other climatic conditions.
A warranty for a minimum of 12 months must be...
It is expected that the Bidder will cooperate closely with PATH and target Hospitals for the new waste handling
building/area and will make available all needed technical information, drawings, etc.,
The following waste streams shall be treated in the new HCW treatment center(s):
Infectious waste
Sharps waste
Pathological waste
Pharmaceutical waste including cytotoxic or genotoxic...