medical waste incinerators

All labels with text shall be in English.

 

 

 

 

Anti-Condensation Heaters

 

 

 

 

The Panel shall be provided with a thermostat controlled anti-condensation heater 240 V, 50 Hz.

 

 

 

 

Earthing System

 

All normal non-current carrying metal parts of the panel and associated components shall be bonded to a common copper

earthbar running the entire length inside the switchboard.

 

The earthbar shall be located in the lower part of the frame work and provided with two termination points for

connection to the main earthing grid.

 

 

 

2.5      Ignition Oil Supply

 

 

MEDICAL WASTE INCINERATOR INTALI8ATION

Design, Supply, install, test and commission medical waste

Incinerator as per the attached specification. The price shall

include all accessories including the civil work and spare part

list to make the system complete.

incinerator burning capacity-250kg/hr                                                  NO       1

 

 

 

 

 

 

 

 

Jimma University Referal Hospital

Incinerator

Medical Waste Incinerator

Purpose

For a complete destruction of waste from various hospital services by heat treatment of high temperature in accordance

with EU standard on emission requirement

Waste from health care activities

Infections waste, laboratory cultures, waste form operation room isolations material in contact with infected

patients, waste potentially being infected by pathogenic agents.

Pathological waste, human fragments, bold, fetus, all body fluids, human tissues.

Sculpts, needles, infusion sets, blades, glass

Pharmaceutical waste.

Chemical waste laboratory reagents, disinfectants

Expired drugs.

Low radiation radioactive element.

Medical waste incinerator: – Ecological Requirement

-No odor

-No fume

-Definitive treatment of waste

Medical waste incinerator: – Manufacturing Standards

-UL, CE, ASME, ISA EURO emission standard

1.Medical waste incinerator

Construction- CS plate shells, FB reinforcement, caste refractory linings,

insulation and    14 gage aluminum jacket.

Type of fuel- Oil fired (Diesel)

Burning Capacity- 250kg/hr and moisture up to 80%

Duration-8-16/Continuous

Average fuel consumption- Very little as much as possible

Control Type- PLC based operation

Operating Temperature- Primary chamber 800c± 50

– Secondary Chamber 1050c ± 50

Size of incinerator – Not more than 15mx7.20m

Chimney – Q630x25meter height and 7mm thick CS.

Combustion efficiency – 99%

Mode of waste handling – Semi- Automatic via ram loader.

Mode of ash handling – Semi- automatic via grate and ash trolley.

Pollution control equipment- Dry settlement zone

Doors – 1- waste charging door in primary chamber

1-Clinker door in primary chamber

1-Ash trolley access door in primary chamber

1-Clean out door in secondary chamber

Burner -2- ignition burner in primary chamber

2-after burner in secondary chamber.

Type- package mono block-fully automatic

Type of burner operation- modulation control

Forced draught fan- 1- primary air fan

1-secondary air fan

Fuel storage tank- Capacity-2500liter above grond

– Material -6mm thick mild steel

-2-diesel pump, gate valve, sfety valve, strainer

pipe, pressure gage, check valve, control board

Level indicator. Etc

Refractory/insulation thickness- not less than 225mm

Ram loader capacity-0.75m3

Electrical supply -380v/3ph/50 Hz

Finish and painting type- powder coated

Audio/Visual alarm system- burner lockout, overload fault

Electrical accessories – primary and secondary chamber temperature

Controller /indicator, auto controls, electrical

Control switches, push buttons, relays contavtors

Thermocouples, burner sequence controllers,

Timers, emergency stop and alarms.