maker of ha zardous waste heater in china


Burning Capability: 125 kg minimum/time (3-6times/ day), twin chamber, double burning system
Assigning door Mouth Size (mm): 760 * 760 (approx.).
Smokeshaft External Size (mm): 300 ± 10.
Combustion Improver Tool: 0.11 kw, Fuel intake: 7kg/ hr (max).
Re-Burning Tool: Oil intake: 5kg/h, 0.37 kw, Oil usage: 10-20kg/ h.
Voltage: 380v/220v Air Conditioning System, Service Guarantee: 1 Year, 50 Hz

Per your promotion for 300 kg.hr. Version– – We require to know the rate with return.

The amount of Kg. of Gas would be needed for running this Style 10 hrs. everyday.

We have our own Products Forwarding Agent.

We had an Agreement for Waste Keeping an eye on before their Civil Fight for 120 Tons/Day for one Town in North Africa.
Medical Waste Heater

Double Chamber (Key & & & & Secondary) with insulation pieces (totally insulated internal refractory lining) in addition to

managed air blower for each chamber

Insulation/ Refractory Density: ≥ 100mm

Chamber plate thickness: ≥ 6mm

Fuel Kind: Gas based upon losing gas in combustion chambers

Waste Capacity: ≈ 150 Kg/Day

Incineration capability: ≈ 25 Kg/Day (Various waste invoicing in addition to waste elimination doors)

Heaters: At the very least with (02) heaters of automated start as well as give up functions

Combustion performance: > > 97%

Temperature level: programmable temperature level with temp monitoring system

Home time: 2 second in secondary chamber

Home heating value: 4000 Kcal

Temperature Level Selection: ≈ minutes 800ºC to max 1200ºC

Electrical supply: 220V with solitary phase

Smokeshaft Plate Density: ≥ 5mm

Water scrubber: Rubbing making use of reagent like lime & & & & must constructed from SS 10 scale of non-corrosion residential properties as well as painted

exteriorly by devices quality heat repellent enamel

Chimney Elevation: in between 15-25 feet