Programming controls. Programming controls should be verified as controlling and cycling the unit in the
intended manner. Proper prepurge, ignition, postpurge, and modulation should be verified. A stopwatch should be used
for verifying intervals of time.
? Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all conditions of
operation and shutdown should be...
The incinerator fuel tank shall meet the following requirements: a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015 including secondary containment. b) The tank shall be sized to hold a 14 day supply of diesel fuel
6) Manufacturer has to provide the following capacity calculations and all supporting information for the incinerator:
– The daily waste stream rate (kg/day...
Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance
for thermal expansion as necessary.
Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are within 1700 mm (5.5 feet) of the floor and are located alongside the area
where personnel will be loading the unit.
Clean interior and...
Including:Incinerator: Structure to be specified
The mark to be specified
Water temperature: 800 to 1000 ° C;
Refractory
Temperature of more than 1100 ° C + obtained;
Capacity: 20-50 kg / hour
Fireplace: 4 to 6 meters high;
Dimension 70 cmx70 crn
Height: 1.10 meters
Fuel: coal;
Aspiration: natural
– A receiving cage for biomedical waste;
– A combustion chamber with a chimney with a filter to retain the ashes;
Chimney section: about 300 cm;...
Test shall be conducted by factory authorized representative of incinerator manufacturer.
Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit. After termination of manufacturer’s predicted burning period, inspect and weigh the residue.
Emissions testing may be deleted if not required by state or local authorities. List all additional tests required by state and local emission...
The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An
integrating meter shall be installed to measure the volume of DO consumed by the incinerator. Suitable pre metering
strainers shall be provided together with a lockable by-pass across both strainer and meter. The meter shall have a
digital read out in litres and shall record quantities from 1 to 99999 with an accuracy of...
The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests
so as to enable sending of one CEB Engineer for witnessing of the factory tests. A ‘Factory Acceptance Test
’ schedule shall be
mutually agreed between the successful Bidder and the CEB Engineer.
NOTE: All charges inclusive of air tickets,...