BURNER, DIESEL DRIVEN
waste kind: MEDICAL CARE WASTE
Waste calorific well worth: 4000KCAL/KG
Dampness Content: 10-25%.
Small Capacity: 50Kg/Hour set tons.
2nd Chamber: 2 Secs @ 850degrees C.
The major burning chamber have to ensure very little leave temperature degree is not less than 850 levels C.
INSULATION.
Calcium Silicate.
Limiting Regular solution limit 1000 levels C.
Thickness 25mm
THROUGHPUT.
50kg/hour at a small calorific well worth of...
Would plant operations be operational on a basis of 24 hours per day, 7 days a week, all year long except for
regular and preventive maintenance periods?
How many hours per year could your process be operational? What would be your approach for larger projects aiming to valorize 1 000 tons per day? How much electricity could be produced using you technology based on a 1 000 tons per day installation to valorize urban wastes...
An operating test should be conducted to ensure that all of the control components have been properly installed and
that all parts of the incinerator, including controls and safety devices, are in satisfactory operating condition. The
requirements for prepurge and time between restarts should be verified. The test should include but not limited to the
following;
? Capacity tests of incinerator
? ...
The successful bidder shall deliver the incinerator skid in a container. The container will be emptied by CEB and
returned to the successful bidder / or to its shipping agent. A containerized solution is also acceptable. Electrically operated 220 volt ( 60 Cycle – 1 phaze )
Able to complete burning material that turns to ashes all the component elements of the carbon or metal in the incinerator with a closed air environment , <98%...
Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labour
and heavy duty equipment shall be provided by CEB.
? The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its procedures for the
installation of the incinerator and exhaust chimney. This should include all mechanical, civil and electrical drawings
and detailed...
Flue Gas Cleaning
System
? Wet Scrubber
? Electrostatic precipitation in combination ( Optional: Rate to be
quoted separately)
7 Chimney Height 10m (minimum)
? Total duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks.
2.11 ...
Incinerator dual chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol range 0‐1200
C, thermocouple, air supply capacity 10m3/ minute, power consumption 1.2kWH/ hour, power 3
phase with netral, cooling water sprinkler capacity 5L/ minute, completed with refractory (insulation,
castable, ceramic blanket) and PLC
SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS
The Waste Incinerator is...
Incinerate: medical waste and general waste Capacity to burn waste:
400-500kg/hr
Fuel: Diesel
Fuel Consumption: 10 liters/hr maximum
Incineration temperature: 950-1300 degrees centigrade
Casing: thick (min 5mm) stainless steel casing and fully insulated to
withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz
Feeding: Automatic
Ash/leftovers removal: Automatic
Flue gas filtration system: Yes
Thus, please send me the full,...
I also research their product details and find it don’t require fuel and also not require fan
blower but that incinerator can only burn waste with 30%-40% humid. I see if your products can burn waste with 30%-40%
humid without fan blower and more 40% humid require fan (Optional solution) which lead us to kick them out.
I don’t have yet precise information on the project opportunities. I have met with the Environment Minister in
Algeria,...