standard type, 11m long ,self supporting
Capacity-220kgs/hr
refuse-hospital waste
average moisture-15-20% on fist time
DIMENSIONS
height: 2710mm
length: 2840mm
Width; 2450mm
loading door opening: 610mm x 610mm
Grate/Heath Area: 2.0(square meters)
Primary chamber volume: 2.4(cubid meters)
secondary chamber volume :2,72(cubid meters0
total volume: 5,12(cubid meters)
minimum stack diameter :560mm
300 kg per day healthcare waste...
A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
Refractory concrete :
Thickness : ≥150 mm
Nature: 65% of Al203
Insulate in fibrous panel...
High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber
(double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single
phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose
pipe. 1100 litre fuel Tank +pipe system Containerised (the container will serve as housing)...
Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of
equipment or piping. Provide space which permits full opening of all doors, panels, and other access openings.
Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of Resident Engineer.
Fuel Oil System: Coordinate set pressure of house fuel oil system with requirements of burner...
heavy Duty Steel casing
High Quality refectory lining & insulation
1 x Diesel fired ignition burners operated on / off
Front Loading Door (safety catch
Separate Ash removal Door
2.7 CONTROL UNIT
The entire processing cycle and the combined effect of the individual components of the incinerator shall be achieved by a central control unit.
The control panel shall consist of a...
The temperature is over the minimum and under the maximum required temperature (e.g 1150?C) of the thermal
reactor (partial load).
When switching off, only the solenoid valve for the fuel supply closes, the burner fan stays on to cool and protect the
burner head.
The reactor burner shall be modulating burner with pre-ventilation working on the principle of an oil pressure atomizer
with return nozzle for diesel oil, consisting...
1. SCOPE OF FEATURE The work specified in the agreement will certainly consist of.
1. Supply, place as well as assign a heater as given in the technological specifications
2. Specification for adherence to OSHA along with other legal demand associating with Health and wellness of staff members throughout execution of the works covered in this tender.
3. Analysis and also prep work as well as building and building of a standard burner shed with...
1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via a separate forced draft fan bookkeeping for the air supplied with burners. Provision shall...