a pet cremator

an animal cremator for our organization in malaysia.currently we are doing specific personal cremation as well as mass cremation for animals in addition to clinical waste.a burner which can shedding between 3 to 5 tonnes daily of mixed waste items, plastics, rubber, combustible putrescible waste, clinical waste, rubber tyres, paper as well as cardboard, fabrics, eco-friendly timber waste etc. As a few of the waste products will contain...

BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FEET CONTAINER

BIOHAZARD DISPOSAL: CONTAINER GENERAL INCINERATOR, IDEAL FOR INCINERATION OF VARIOUS TYPES OF WASTE, TOTALLY CONTAINERISED IN A 20 FT CONTAINER, TO CONSIST OF BUILT-IN FUEL CONTAINER As Well As GENERATOR. TECHNOLOGICAL SPECS: BURNING CHAMBER QUANTITY (M3); 0.54 m3. SUGGESTED SET SIZE: 60 KG, BURN PRICE: 69 KG PER HOUR, AVERAGE GAS CONSUMPTION 13 KG PER HOUR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS,...

install a diesel fired burner

blaze mostly pharmaceuticals (all kinds of dosage kinds … … syrups, tablets, injectables) medical consummabables, as well as likewise biological fluids ……. Capacity around 10 kg/ hour. install a diesel discharged incinerator that can accommodate a set tons of approximately 100 kg with a day-to-day burning need of up to 500kg per 8 hour day. Industrial Incinerator to damage. the pharmaceuticals waste like Alu, PVC, PVDC etc.Installation...

50 to 60kg/hr as well as 100 to 120kg/hr diesel powered incinerator

50 to 60kg/hr and 100 to 120kg/hr diesel powered burner.1. Ability to Incinerate the Complying With Types of Waste: Family waste, glass, steel, light weight aluminum containers and also window extrudes, steel canisters (smashed), hardwood, tires, white goods, plastic containers, pressure packs, medical waste as well as quarantine waste. 2. Needed Blazing Capacity: Around 4,500 loads annually. The incinerator has to efficient in blazing sort of...

2 combustion chambers type burner

Load Capacity minimum:  1500 kg Burner fuel type:  Diesel Burner fuel rate max.:   20-25 Liter diesel/ per hour Burners minimum: 3 Burning rate minimum: 200-300kg/per hour Furnace bar area minimum: 2 м3 Fuel tank capacity minimum: 300L Main chamber burning temperature min. 1100 0C Afterburner chamber burning temperature min.  1300 0C Power supply 220V Incinerator items and electrical appliances should be weather...

Gasified incineration for melting medical wastes incinerator

Gasified incineration for burning clinical wastes. Gas kind: Natural Gas Burning Capacity: –– 30-50 kg/time –– Daily 3-6 times Burner size: max 2000x1200x3200 mm Burning room volume: –– Gasification space max 0.7 m3, –– Additional burning area max 0.5 m3 , Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 kW Combustion-support burning devices: – Power max 0,2 kW INCINERATOR (WASTE BURNER). Created to...

Containerized diesel fueled incinerators

Burner Kind: Containerized, gasoline Burning Rate:100–– 120kg/hour. Minimum Operating Temperature:850 o C( primary combustion). Maximum Operating Temperature:1450 oC( Afterburner chamber). Additional Burning Capacity: Compulsory. Thickness Insulation:20 mm High. Refractory Spreading: Minimum 65mm. Sturdy refracting lining to withstand:1500 oC. Typical stress out time: maximum:3 humans resources. Fuel kind: Diesel. Fuel Consumption in...

Medical Waste Incinerator Trailer Mounted

*Double combustion chambers *Smoke filter chamber and S.Steel chimney *Italy Riello Oil burner and PLC Auto. control *Heavy duty mobile trailer with safe parts  *Minimal installation *Mobile by truck tractor  1. Should be Trailer mounted Trailer Type 2. Be able to burn Medical waste 100-200kgs per hour 3. Diesel diesel oil type 4. 220 V single phase 5. Incinerating temperature range 800-1200 degree Celsius  ...

Diesel/LPG/LNG burning key burning chamber/primary combustion incinerator

Main burning Diesel/LPG/LNG burning key combustion chamber/primary combustion zone Second burning Home time in the second chamber not less than 2 secs Both key as well as the secondary temperatures preserved up until all the waste has actually been completely ignited Chimney Chimney with a minimal height of 4 meters above ground level Minimum leave velocity of the discharges not much less than 10 metres/second Temperature level Cautions Distinct...